projects
UNDERGROUND SERVICE UNIT
Designed in consultation with underground maintenance service department staff. Providing functional & practical solutions for everyday tasks, whilst conforming to relevant standards & ability to deal with harsh conditions of underground equipment life.
VARIOUS WATER TREATMENT PLANTS
From Pipe Spools and Valving Through to Structures and Civil Works. Incorporating Mechanical, Structural & Piping disciplines together for good project outcomes.
gallery
LIFTING MODULES FOR TELECOMMUNCATION INDUSTRY
TRUSSES FOR ERECTION OF TELECOMMUNICATION EQUIPMENT
MAINGATE LOOP TAKE UP
INCREASED NUMBER OF BELT LOOPS IN LTU TO GIVE OPERATOR LONGER LENGTH OF BELT TO SPLICE AS PROGRESSING. ADDED BELT CLAMP AT HEAD & TAIL ENDS. ADDED SPLICING STATION PLATFORM – PLATFORMS, GUARD, STAIRS, HANDRAILS, NEW PULLEY CARRAIGE & TAG’A’LONG CARRIAGE. STIFFENED UP EXISTING STRUCTURES TO CATER FOR ADDITIONAL LOAD. ADDED ADDITIONAL PULLEYS, STEELWORK, UPGRADED WINCH SYSTEM. NEW CIVIL WORKS.
ACCESS PLATFORM
TYPICAL ACCESS PLATFORM FIT FOR PURPOSE IN PLANT
TERRIARY AIR DUCT
FEASABILITY STUDIES THROUGH TO DETAILED DESIGN. ADDING ADDITIONLA PROCESSES TO CEMENT PLANT TO REDUCE WASTE & INCREASE PRODUCT RETURNS. THIS WAS AVCHIEVED THROUGH VARIOUS METHODS, ESSENTIALLY REDIRECTICTING OTHERWISE WASTE BACK INTO EXISTING PROCESSES. THIS INVOLVED ADDITION OF 35M BUCKET ELEVATOR, MULTIPLE SCREW CONVEYORS, NEW HOPPER,CRUSHING STATION, REFRACTORY LINED PIPES & CHUTES, PLATFORMS, STEELWORK, STAIRS, ETC… WORK FOCUSED AROUND SAFE WORKING ENVIRONMENT AND CONSIDERATIONS OF NEAR BY RESIDENTS.
CEMENT PLANT SITE ARRGT
ADDITION OF NEW PALLETISER. INCREASED CAPACITY OF DUST COLLECTOR SYSTEM. INTERFACE WITH EXISTING PLANT WITH VARIOUS OTHER ADDED IMPROVEMENTS TO PLANT. NEW CONTROL ROOM, MODIFIED WORK FLOW FOR INCREASED PRODUCTIVITY.
DEWATERING TRIPPER
ADDITION OF NEW DEWATERING TRIPPER INTO EXISTING UNDERGROUND CONVEYOR SYSTEM. COMPRISED OF NEW DRIVE SYSTEM, PLATFORMS, STAIRS, GUARDS, DEWATERING SCREEN & STRUCTURES, DRIVES, ROLLER & RETURN IDLERS, SIDE PLATES, ETC.
SPECIAL PURPOSE FRAME
SPECIAL PURPOSE FRAME FOR THE MANUFACTURE OF CONCRETE PIPES. SITE MEASURE OF EXISTING EQUIPMENT. MAKE IMPROVEMENTS AND NEW SUPPLY TO SUIT SHUTDOWN SCHEDULE, ON TIME & EASE OF INSTALLATION TO SUIT EXISTING PLANT
CHUTE-ASSY
PROVIDE NEW DFRAWINGS & IMPROVEMENTS TO EXISTING CHUTE ASSEMBLY TO IMPROVE PRODUCT MATERIAL FLOW
CONVEYOR CHUTE
MULTIPLE NEW CONVEYOR TRANSFERS FOR NEW ALUMINA PLANT. CHUTEWORK, DEFLECTORS, SPOON CHUTES, LINERS, STRUCTURES, CONVEYORS, GUARDS, ETC.
COAL PROCESSING MODULES
NEW MODULAR COAL PROCESSING PLANT. STRUCTURES, STAIRS, PLATFORMS, SCREEN, CHUTES, PUMPS, PIPING SYSTEMS, STORAGE TANKS, CYCLONES, ETC.
UNDERGROUND STAGE LOADER
UNDERGROUND EQUIPEMENT
ROM HOPPER ASSY
RUN OF MINE HOPPER. NEW HOPPER, GRIZZLY & STRUCTURE FOR EXISTING PLANT
TRANSFER TOWER
ALL NEW TRANSFER TOWERS, PACKAGES GENERALLY INCLUDE: STRUCTURE, PLATFORMS, STAIRS, HEAD CHUTE, DEFLECTOR, SPOON, GUARDS, SOMETIMES TRAMP MAGNET FOR RUBBISH METAL REMOVAL TO MAINTAIN BELT HEALTH.